Two alternative channels on either side of the closed main channel were
opened this week to help with cleanup efforts and to allow smaller vessels,
such as tugboats and barges, to pass through with approval.
“USACE engineers are aiming to reopen the permanent, 700-foot-wide by
50-foot-deep federal navigation channel by the end of May, restoring port
access to normal capacity” says USACE.